Week-3

Par Niels Galitch, Yekan Deli, 14/03/16

This week was mostly consecrated to finding a way to construct our project within the protostructure. The horizontal parts being unable to support to much weight we had to find a way to make every thing hold on the vertical beams.


The solution we found is based on a "flag system". We attach a frame to a vertical beam like a flag so it does not directly touch the horizontal beams. The whole thing being stabilised by a triangulation at the very top of the structure.


Triangulation system



Image Mon Mar 14 2016 08:18:08 GMT+0100 (CET)  Image Mon Mar 14 2016 08:18:08 GMT+0100 (CET)


With some of the flags



Image Mon Mar 14 2016 08:18:08 GMT+0100 (CET)    Image Mon Mar 14 2016 08:18:08 GMT+0100 (CET)





Of course this system was studied trough drawings as well


Plan



Image Mon Mar 14 2016 08:18:08 GMT+0100 (CET)


Elevation



Image Mon Mar 14 2016 08:18:08 GMT+0100 (CET)