• Rooms, final post

    Par Anastasia Skorik, Maria Sienko, 19/03/17

    ROOMS,Final post



    Image Sun Mar 19 2017 10:55:56 GMT+0100 (CET)

    We developed the holding structure(the treillis) in order to improve the montage on the site. The whole structure can slide in a compact shape, when the verticals are removed.


     

    Image Sun Mar 19 2017 10:55:56 GMT+0100 (CET) Image Sun Mar 19 2017 10:55:56 GMT+0100 (CET)

    Two positions:          Scène de vie quotidienne and  Stoa


    Image Sun Mar 19 2017 10:55:56 GMT+0100 (CET)



    Drawings:

    Monge  |   Axonometry  |   Perspective


    Image Fri Mar 24 2017 16:31:37 GMT+0100 (CET) Image Fri Mar 24 2017 16:31:37 GMT+0100 (CET) Image Fri Mar 24 2017 16:31:37 GMT+0100 (CET)





  • Rooms research

    Par Anastasia Skorik, Maria Sienko, 13/03/17

    ROOMS RESEARCH

    In relation with the shape of the train bridge above as well as the length of the protostructure itself, the passage came naturally as an evidence.

     Image Mon Mar 13 2017 10:45:22 GMT+0100 (CET)        Image Mon Mar 13 2017 10:45:22 GMT+0100 (CET)

    A mobile colonnade/filter emphasize the effect of prolongation when closed, also creating an open space "scène de vie quotidienne" when opened.     


    Image Mon Mar 13 2017 10:45:22 GMT+0100 (CET)

    The passage is elevated just in order to allow a person to assess it, while keeping a distance from the ground to keep the analogy with the elevation of the train bridge. 



  • PLANES, linked spaces

    Par Anastasia Skorik, 19/12/16

    PLANES, final model

    Focus on the opening and the corner, which creates an interaction between two spaces.

    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)


    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)


    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)

    The corner, the link of the wooden and plaster dalle

    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)   Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)

    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)

    Details of the structure


    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)

    Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)Image Mon Dec 19 2016 20:50:31 GMT+0100 (CET)

    Monge and axonometry of the wall and the dalle 1:40, (detail wall-protostructure 1:20)



  • PLANES, Second test Dalle

    Par Anastasia Skorik, 06/12/16



    PLANES/ Second test, Dalle

    Second test of the dalle moulage, a thin dalle shaped in order to fit into the protostructure.

    Image Tue Dec 06 2016 19:38:26 GMT+0100 (CET)    Image Tue Dec 06 2016 19:49:30 GMT+0100 (CET)

    Views of how the moulage grips the protostructure.


    Image Tue Dec 06 2016 19:38:26 GMT+0100 (CET)

    Profile view



  • PLANES, First Dalle

    Par Anastasia Skorik, 28/11/16

    PLANES

    First test of the dalle of the inside molded directly into the protostructure

    Image Sun Nov 27 2016 23:33:00 GMT+0100 (CET)  Image Sun Nov 27 2016 23:33:00 GMT+0100 (CET)

    The protostructure works here like the armature for concrete.

    L



    Image Sun Nov 27 2016 23:33:00 GMT+0100 (CET)

    Point of view in front of the doorstep


    Image Sun Nov 27 2016 23:33:00 GMT+0100 (CET)

    View from the corner