• Rooms : Final project (week 4)

    Par Belaich Yonah, Tiezzi Alessandro, 21/03/17

     Rooms - Pass Above


    Our last propose is an unhuman scale and dark corridor with a floor light line guiding the passengers. As we have a dark and stretched continuity, the idea was to use the longitudinal space to create a cinematographic room. The name of the project has been choosed according to the decision to pass above an other project. 

    Alcove is used to occupate the space in different directions. However, after several trials we couldn't find a bright solution to position them. An other point to explore is the surface created below the stairs.


        ROOMS_JC_belaichyonah-tiezzialessandro_104      ROOMS_JC_belaichyonah-tiezzialessandro_103      ROOMS_JC_belaichyonah-tiezzialessandro_102      ROOMS_JC_belaichyonah-tiezzialessandro_101        

                                            Exit                                              Passage over the other project                  Projection room                          Entrance



        ROOMS_JC_belaichyonah-tiezzialessandro_201   ROOMS_JC_belaichyonah-tiezzialessandro_202   ROOMS_JC_belaichyonah-tiezzialessandro_203    

                                Plan and Section                                                      Sections                                                           Details



        ROOMS_JC_belaichyonah-tiezzialessandro_105  ROOMS_JC_belaichyonah-tiezzialessandro_106  ROOMS_JC_belaichyonah-tiezzialessandro_107

    Stairs



       ROOMS_JC_belaichyonah-tiezzialessandro_108 ROOMS_JC_belaichyonah-tiezzialessandro_109 ROOMS_JC_belaichyonah-tiezzialessandro_204

                                   View in context                                                                         Alcove - Research drawing of the alcove       




  • Rooms : Week 2

    Par Belaich Yonah, Tiezzi Alessandro, 21/03/17

    Image Wed Mar 22 2017 11:36:23 GMT+0100 (CET)      Image Tue Mar 21 2017 17:40:57 GMT+0100 (Europe de l’Ouest)

          Plan and sections in process                  Developement of "Alcoves"

    Image Tue Mar 21 2017 17:40:57 GMT+0100 (Europe de l’Ouest)   Image Tue Mar 21 2017 17:40:57 GMT+0100 (Europe de l’Ouest)

    Noads Between walls                                                                    View from the top                             



  • Rooms : Week 1

    Par Belaich Yonah, Tiezzi Alessandro, 21/03/17

    After the essentials tools developped (Protostructure, site draw, noads) by differents groups, we make an exercice by 2: Pick up 3 words from each colums to create a special situation.                                                                                                    Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)


    Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)  Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)  Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)




    From this exercice we developped a project: Pass Under. Pass under is a dark coridor than try to use his limited space and his characteristics. Characeristics: under a train bridge - narrow - in the center of the protostructure. Space conditions: narrow - long.


    Image Wed Mar 22 2017 11:33:15 GMT+0100 (CET)                 Image Wed Mar 22 2017 11:33:15 GMT+0100 (CET)                          Research Draw in Plan                                                                  Axonometric view


    Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)                        Image Tue Mar 21 2017 17:19:00 GMT+0100 (Europe de l’Ouest)
    First propostion of corridor                                                                  First propostion of floor


    The traject wasn't already clearly defined. But we think to do a floor than lead utilisators.



  • Phase 3 - Final presentation

    Par Belaich Yonah, 19/12/16

    Image Mon Dec 19 2016 22:21:35 GMT+0100 (Romance Standard Time)  Image Mon Dec 19 2016 22:21:35 GMT+0100 (Romance Standard Time)Starting point & Reversed perspective from the painting.


    "Dans l'architecture, plus au reste que dans tout autre art, l'ornementation doit subir l'influence des procédés de mise en oeuvre de ces matériaux." (Charles Lucas)

    "Il n’est plus seulement imaginé comme un motif imitant quelque chose, mais également comme un fait découlant directement du principe constructif et de la mise en œuvre des matériaux". (Jennifer Monnet, Master EPFL, 2015)

    "La limite est absolument essentielle à toute civilisation humaine, à l’image du simple sillon tracé par Romulus pour fonder la Rome antique. Le mur est un marquage instinctif de l'espace et une frontière qui permet à une intériorité d’exister." (Richard Scoffier)


    Image Thu Dec 22 2016 22:30:01 GMT+0100 (Romance Standard Time) Image Thu Dec 22 2016 22:30:01 GMT+0100 (Romance Standard Time) Picture 1                                                                                                            Picture 2

    Image Thu Dec 22 2016 22:30:01 GMT+0100 (Romance Standard Time) Image Thu Dec 22 2016 22:30:01 GMT+0100 (Romance Standard Time)  Picture 3                                                                                                      Picture 4

    Image Mon Dec 19 2016 22:21:35 GMT+0100 (Romance Standard Time)  Image Mon Dec 19 2016 22:21:35 GMT+0100 (Romance Standard Time)

    Plan                                                                                                    Isometric view

    Image Mon Dec 19 2016 22:21:35 GMT+0100 (Romance Standard Time)  Image Mon Dec 19 2016 22:21:35 GMT+0100 (Romance Standard Time)

    Section 1                                                                                             Section 2 & Details

                                      Image Tue Dec 20 2016 22:21:47 GMT+0100 (Paris, Madrid)

                                              Common project: Assembled in line, the 4 projects create a new experience


  • Phase 3 - Exercise 2 - Third approach

    Par Belaich Yonah, 11/12/16

    According the critic of my first approach, I refocused on the essentials notions that were in the painting: the wall (Separation) and the door (passage).


    Image Sun Dec 11 2016 15:25:35 GMT+0100 (Romance Standard Time) Image Sun Dec 11 2016 15:25:35 GMT+0100 (Romance Standard Time)

    Starting point.                                                   New approach.




    There is a side of the wall that is not clearly disclosed. I decided to link this two very contradictory elements. The wall that appear as a mass is in fact very thin and the passage is a penetration in the wall.



    Image Sun Dec 11 2016 15:25:35 GMT+0100 (Romance Standard Time)   Image Sun Dec 11 2016 15:25:35 GMT+0100 (Romance Standard Time)



    The hidden side.                                                                                          Inspiration - C. Scarpa Brion Cemetery.


    Image Sun Dec 11 2016 21:36:19 GMT+0100 (Romance Standard Time) Image Sun Dec 11 2016 21:36:19 GMT+0100 (Romance Standard Time) Image Sun Dec 11 2016 21:36:19 GMT+0100 (Romance Standard Time)

    Plan, scale 1:20                                     Section, scale 1:20                              Elevation, scale 1:20 


    Y.B.