• The final presentation

    Par Michel Kyra Lea, Vié Cyrielle Noémi, 21/10/16

    Final Presentation of the first phase of our work titled "Measures".

                     Casting the void: where strata changes

                     Two perspectives per individual (interior and exterior)

                     Monge perspective of a building on site (Tour Bel-Air)




         Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)  Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)   Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)

                                   Measuring the site - visual impressions of the site - Geometricity of the site

         Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)  Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)  Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)

                                                       Improving the casts - Site (1935) - Site detail : stairs

                Image Fri Oct 21 2016 21:21:06 GMT+0200 (CEST)    Image Fri Oct 21 2016 21:21:06 GMT+0200 (CEST)

                                       Casting the strata: Stairs and facade with support (copper sticks, 2mm)

              Image Fri Oct 21 2016 21:21:06 GMT+0200 (CEST)    Image Fri Oct 21 2016 21:21:06 GMT+0200 (CEST)

                                                      Perspectives of the three casts together, Cyrielle Vié

              Image Fri Oct 21 2016 21:21:06 GMT+0200 (CEST)    Image Fri Oct 21 2016 21:21:06 GMT+0200 (CEST)

                                                    Perspectives of the three casts together, Kyra Lea Michel


     Image Mon Oct 31 2016 15:31:13 GMT+0100 (CET)Image Mon Oct 31 2016 16:05:02 GMT+0100 (CET)

                                        Monge perspective (Tour Bel-Air) containing the elements casted in dotted lines

                                                                    Aspect of panel of final presentation



  • Final presentation - Week 4

    Par Born François Nicolas Emmanuel, Terrien Romane, 21/10/16

    Here is the final presentation of nearly one month of work. In this exercise we present differents strategics parts of our "working area". The goal is to describe at best the architecture of a spesific place of Lausanne: the Flon, but more precisely our choosen facade. We separate the facade in three differents stratas wich can help the understanding of the facade anchor in this area called the Flon. We also present five drawings which are: one final Monge projection of our choosen facade, two inside perspective of our strip and two outside perspective.


    MEASURES_JC_terrienromane-bornfrançois_130MEASURES_JC_terrienromane-bornfrançois_129MEASURES_JC_terrienromane-bornfrançois_128


    MEASURES_JC_terrienromane-bornfrançois_127MEASURES_JC_terrienromane-bornfrançois_126MEASURES_JC_terrienromane-bornfrançois_125


                                         MEASURES_JC_terrienromane-bornfrançois_124MEASURES_JC_terrienromane-bornfrançois_123


                                                                              The finals models: 


                                     MEASURES_JC_terrienromane-bornfrançois_122MEASURES_JC_terrienromane-bornfrançois_121

                                                MEASURES_JC_terrienromane-bornfrançois_120MEASURES_JC_terrienromane-bornfrançois_119

                      MEASURES_JC_terrienromane-bornfrançois_118       MEASURES_JC_terrienromane-bornfrançois_117

        

                                                                      The final monge of our facade: 


                                               MEASURES_JC_terrienromane-bornfrançois_210


                                                                               Outside Perspective:


          MEASURES_JC_terrienromane-bornfrançois_209      MEASURES_JC_terrienromane-bornfrançois_208


                                                                               Inside Perspective:


         MEASURES_JC_terrienromane-bornfrançois_207    MEASURES_JC_terrienromane-bornfrançois_206



  • measures final presentation

    Par Di Munno Lydia Anjali, 21/10/16

    This is the final mould I did for this first project. It is the same as the previous exercise but with less height and we still can see the whole bridge.

             Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))  Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))

                                                     Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))                           

                                                 The détails of the corner of the building and the bridge.



                             Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))

           The plaster in a general viewpoint. The height of the bridge is at the same level as the roof of the building.



                                                   Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))


           Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))  Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))       The corner of the building before and after casting.


           Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))  Image Thu Oct 20 2016 23:56:56 GMT+0200 (Europe de l’Ouest (heure d’été))

          The structure of the model.







  • Exercise 2.2 - Casting the void (advance)

    Par Belaich Yonah, 20/10/16

    The façade, plan and section of a building contained in the group's strip. Scale 1:66. Maximum 2 papers vertically oriented. Cast of one of the strata selected.


    Image Thu Oct 20 2016 21:44:20 GMT+0200 (Romance Daylight Time)

    The Monge projection drawing of a façade-plan-section of a building contained on the strip.



    Image Thu Oct 20 2016 21:44:20 GMT+0200 (Romance Daylight Time)        Image Fri Oct 21 2016 15:31:50 GMT+0200 (Romance Daylight Time)

    Final cast in an interesting point of view.              Details.

    Y.B.




  • Exercise 2.1- Casting the void (of the bridge)

    Par Belaich Yonah, 20/10/16
    Based on the section of the bridge given by the studio, I make the mould and cast a volume of 10 cm wide, by 4 cm deep, by 8 cm height, with an extrusion of the profile of the bridge at scale 1:132 subtracted.



    Image Thu Oct 20 2016 21:37:49 GMT+0200 (Romance Daylight Time)        Image Thu Oct 20 2016 21:37:49 GMT+0200 (Romance Daylight Time)

    The plan on the cardboard.                                                    The formwork before cast.                 



    Image Thu Oct 20 2016 21:37:49 GMT+0200 (Romance Daylight Time)

    The final cast.



    Image Thu Oct 20 2016 21:37:49 GMT+0200 (Romance Daylight Time)      Image Thu Oct 20 2016 21:37:49 GMT+0200 (Romance Daylight Time)    

    The side of the smal hole.                                          The side of the big hole.

    Y.B.