• Casting the void (Advance)

    Par Cheneval Alain Gabriel, Ogbonna Gabriel Ihechimnemerem, 21/10/16

    After casting the section of the bridge, we had to choose three moments on our strip were the architecture changes, three stratas that we wanted to concentrate our work on. By casting and representing them on a Monge projection of the facade that we have chosen with segmented lines.

     First, we've taken the escalator which connects the roof of the Fnac and the entry of the shop. The fact that it is a "fluid" moment was one of our arguments, comparing with the two other ones. And connecting two levels of the place represents well the adaptation of the architecture to the landscape of the town.

    Secondary, the column. Due to the historical background of the column that we’re watching in the theatrical part of the semester, it was the opportunity to make a dialog between both. It isn't only the portico of the "factice main entrance", it has a little balcony on the frieze.

    And finally, the different windows. The different windows are a module that structure the whole building in the height and the width. The facade is made of different windows with different frames on different levels, point/thing that we wanted to underline.



                                                     Image Fri Oct 21 2016 15:01:37 GMT+0200 (Europe de l’Ouest (heure d’été))

                                                                              the first Monge projection that shows the stratas


                                                    

                                                                              the different moulds and casts

                                            

        

                                                      Image Tue Nov 29 2016 10:37:55 GMT+0100 (Europe de l’Ouest)


     

                                                      Image Fri Oct 21 2016 15:01:37 GMT+0200 (Europe de l’Ouest (heure d’été))


                                                      Image Fri Oct 21 2016 15:01:37 GMT+0200 (Europe de l’Ouest (heure d’été))        Image Tue Nov 29 2016 10:37:55 GMT+0100 (Europe de l’Ouest)   

                                                                                the elevator

                                

                                          


                                                       Image Fri Oct 21 2016 15:01:37 GMT+0200 (Europe de l’Ouest (heure d’été))

                                                                                 the widows

                                                                             

  • Exercise 2.2 - Casting the void (advance)

    Par Belaich Yonah, 20/10/16

    The façade, plan and section of a building contained in the group's strip. Scale 1:66. Maximum 2 papers vertically oriented. Cast of one of the strata selected.


    Image Thu Oct 20 2016 21:44:20 GMT+0200 (Romance Daylight Time)

    The Monge projection drawing of a façade-plan-section of a building contained on the strip.



    Image Thu Oct 20 2016 21:44:20 GMT+0200 (Romance Daylight Time)        Image Fri Oct 21 2016 15:31:50 GMT+0200 (Romance Daylight Time)

    Final cast in an interesting point of view.              Details.

    Y.B.




  • P1-E 2.2 Measures - Drawings

    Par Tiezzi Alessandro, 20/10/16

    In this exerecice, we drew a plan of our strip (n°10) with the dimensions of the building, street, road, ...


    Image Thu Oct 20 2016 17:09:14 GMT+0200 (W. Europe Summer Time)



    We drew our first Monge projection of our facade too.


    Image Thu Oct 20 2016 17:09:14 GMT+0200 (W. Europe Summer Time)


    We will draw other Monge projections because this one is too small and it doesn't analyse so much things.



    We also did some casts but the plaster broke so we didn't take any pictures. Moreover, we misunderstood the exercice so we had to recast some mould (see P1-E 2.3).


    Image Fri Oct 21 2016 17:59:45 GMT+0200 (W. Europe Summer Time)


    This is a first cast of the facade but we will do an other and better cast.


  • Measures ex. 2.2

    Par Di Munno Lydia Anjali, 17/10/16
    This exercise is the first experiment for the final presentation and the intention was to find a space in the area we were assigned which could show a special structure of architecture. I choosed to study the relation between the corner of a building and the bridge of Zurich. What I found interesting was to alline the bridge to the roof of the building because they have a similar shape.



                      Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))

                      The plan of the mould (Monge projection).

                                                                                       


                                                                                                      


            Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))  Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))  Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))

            The structure of the mould.


                                                  Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))

                                                  Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))                                             
                                                 The corner of the buiding before and after casting.                


                     

         Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))  Image Mon Oct 17 2016 14:30:37 GMT+0200 (Europe de l’Ouest (heure d’été))

        The entire mould.







  • P1- E 2.2 - Casing the void

    Par Hassan Moallin Madina, Medic Marina, Rampazzi Lia Giovanna Laura, 14/10/16




                                                                       MONGE OF THE FIRST MOLD


                                 Image Fri Oct 28 2016 10:44:29 GMT+0200 (CEST)                                          

                                                                                                                                   Scale 1:132



                                                                                        FIRST MOLD

                 

                           Image Fri Oct 14 2016 20:07:45 GMT+0200 (CEST)              Image Fri Oct 14 2016 20:07:45 GMT+0200 (CEST)

                  


                                                           


                  Image Fri Oct 14 2016 20:07:45 GMT+0200 (CEST)      Image Fri Oct 14 2016 22:09:31 GMT+0200 (CEST)      Image Fri Oct 14 2016 22:09:31 GMT+0200 (CEST)

                                                                                                                  Looking for a method of suspension   



                                           Image Fri Oct 14 2016 20:07:45 GMT+0200 (CEST)         

                                                                                                                                     Suspension   

      


                                Image Fri Oct 14 2016 20:07:45 GMT+0200 (CEST)                                Image Fri Oct 14 2016 22:09:31 GMT+0200 (CEST)





                                                       HOW MUCH LEGS ARE NEEDED FOR THE LONGEST PIECE ?                                                                                                                                     


        Image Fri Oct 14 2016 20:52:26 GMT+0200 (CEST)    Image Fri Oct 14 2016 20:52:26 GMT+0200 (CEST)    Image Fri Oct 14 2016 20:52:26 GMT+0200 (CEST)

                                                                                                                                                                  Test mold