• The Knot

    Par boxebeld carlotta, 01/12/16

                                Image Mon Dec 19 2016 21:48:29 GMT+0100 (CET)                       Image Mon Dec 19 2016 23:40:21 GMT+0100 (CET)                                                                    Bruce Nauman, Wall Floor Position (1968)                                                  Sol LeWitt, Untitled (1971)

                                    

                                                     Image Mon Jan 09 2017 17:37:28 GMT+0100 (CET)

                                                                                           Claude Parent, Vivre à l'oblique (1970)




                     T

                           H

                                 E                                                   L 

                                        K                          A                         

                                               N                  

                                  I                   O                                

                F                                            T


                                                                                            


    How as an individual we establish a link between vertical and horizontal? How with our movements do we perceive this knot


    The diagonale is the element which give us the possibility to pass from a level to another, it links them. Then the oblique plan is the access, from an horizontal plan to verticality by the possibility to go up and down. 

    In this final phase of Planes the idea of my project was to create a space composed by an horizontal plan and two oblique plans (with two different slopes) which links three levels of three plans of the constellation of protostructures. Then, it's a reflexion on the possibilities of different sensations that the oblique plan can offer when we are on, under or between it.



     Image Mon Dec 19 2016 22:08:15 GMT+0100 (CET) Image Mon Dec 19 2016 22:08:15 GMT+0100 (CET) 


               Image Mon Dec 19 2016 22:08:15 GMT+0100 (CET)    Image Mon Dec 19 2016 22:08:15 GMT+0100 (CET)    Image Mon Dec 19 2016 22:08:15 GMT+0100 (CET)   

                                                                                              Photographs of the final project




    Image Mon Dec 19 2016 22:32:00 GMT+0100 (CET)Image Mon Dec 19 2016 22:32:00 GMT+0100 (CET)


    Monge of the project in the protostructure 1:80 and axonometry of details 1:20                       Axonometry of the project in the protostructure 1:66

                                                                                                                


                                  

                                                                                                                                           


            

          //W e e k 3



    T

            H

                    E

                            K 

                                    N

                                               O

                                                        T


    At this stage of Planes, my project evolved into an alternation of oblique and horizontal plans with the idea of the diagonale as the link between my horizontal plans (of the past steps of the project) and verticality. 


     Image Tue Dec 13 2016 14:28:51 GMT+0100 (CET)   Image Tue Dec 13 2016 14:31:12 GMT+0100 (CET)


     Image Tue Dec 13 2016 14:28:51 GMT+0100 (CET)   Image Tue Dec 13 2016 14:28:51 GMT+0100 (CET)



                                                                                                                                                                                                                                                                                                                                                                                      

           //W e e k 2


            H

            O

            R

            I

            Z

            O

            N

            T

            A

            L


    In the continuity of the idea of first mold, I defined the dimensions of the plaster in relation between the heights of the highest and the lowest mold of the studio to create a reference to facilitate the action of projection of the horizontal plans.                   Image Mon Dec 05 2016 18:11:44 GMT+0100 (CET)

                            Monge of the first plaster modified with the new plaster in the protostructure 1:66




                       Image Mon Dec 05 2016 17:59:52 GMT+0100 (CET)

                                                             Axonometry of the protostructure with the mold 1:21



                                                                                                                                                                                         


            //W e e k 1


                             P

                             R

                       H    O    R    I    Z    O    N    T    A    L

                             J

                             E

                             C

                             T

                             I

                             O

                             N

    P    L    A    N      S


    The idea is to find the knot between horizontal and vertical plans by the abstraction of the horizontal ones. Then, the mold is a screen where mentally, we project the different levels of the other molds of the scenario model Lausanne.


    Image Mon Dec 05 2016 01:44:04 GMT+0100 (CET)   Image Mon Dec 05 2016 01:44:04 GMT+0100 (CET)

    Image Mon Dec 05 2016 01:44:04 GMT+0100 (CET) Image Thu Dec 01 2016 22:02:27 GMT+0100 (CET)            

                                                   Photographs of the mold in the scenario model and of details




                   Image Mon Dec 19 2016 19:40:03 GMT+0100 (CET)

                                                                                                Monge of the first mold 1:66




    // Tests of castings of plaster with a reusable mold.

                              Image Mon Dec 05 2016 01:55:04 GMT+0100 (CET)  Image Mon Dec 05 2016 01:55:04 GMT+0100 (CET)  Image Mon Dec 05 2016 01:55:04 GMT+0100 (CET)




  • Level's discordance

    Par barbey samuel, boxebeld carlotta, 22/11/16


                                  Image Tue Nov 22 2016 10:41:02 GMT+0100 (CET)

                                                 Mother and daughter in a room pantry, 1660, Pieter De Hooch




                            Image Mon Dec 05 2016 19:46:01 GMT+0100 (CET)

                                                                                                        Inverse Perspective



                       We focused on the different levels between the rooms and the second floor, suggested by the stairs.                                                                                       

                       

                       Image Tue Nov 22 2016 10:08:03 GMT+0100 (CET)

                                                                First plaster superposed on the second one



                       Image Tue Nov 22 2016 10:40:01 GMT+0100 (CET)

                                                                                    Second plaster



                We restricted our last plaster to our guiding line by abstracting all the details that leads us away from our idea.

                    

                       Image Tue Nov 22 2016 10:03:44 GMT+0100 (CET)

                                                                                   Last plaster        


  • Horizon's connection

    Par barbey samuel, abbas oria, boxebeld carlotta, silva gabriel, 02/11/16

    The element is situated along the billboard which stands in front of the fnac entrance.This billboard designed like a tower permited us to link two separated analysis of each level during "Measures" phase.Now the tower is physically used to install an element which brings an acces from the "Fnac level" to the "Bel-Air level".

                                                                                                                                                                    

    Week 4:

     
                         Image Mon Nov 14 2016 23:33:29 GMT+0100 (CET)


                         Image Mon Nov 14 2016 21:31:06 GMT+0100 (CET)       Image Mon Nov 14 2016 21:37:59 GMT+0100 (CET)       Image Mon Nov 14 2016 21:31:06 GMT+0100 (CET)


                                                   The bed is the horizontal continuity of the "Bel-Air" level.


                         Image Mon Nov 14 2016 20:52:17 GMT+0100 (CET)    Image Mon Nov 14 2016 20:52:17 GMT+0100 (CET)

                                                      The door acting like the access of the installation

                                     The continuity of the horizontal white line appears when the element is open.


     

      Image Sun Nov 13 2016 15:05:16 GMT+0100 (CET) Image Sun Nov 13 2016 15:05:16 GMT+0100 (CET) Image Sun Nov 13 2016 14:55:54 GMT+0100 (CET) Image Sun Nov 13 2016 14:55:54 GMT+0100 (CET)   Image Sun Nov 13 2016 14:55:54 GMT+0100 (CET) Image Sun Nov 13 2016 14:52:14 GMT+0100 (CET) Image Thu Dec 01 2016 16:05:05 GMT+0100 Image Sun Nov 13 2016 14:52:14 GMT+0100 (CET)

                                                                            Element's mechanism



    Week 2 and 3:


                              Image Tue Nov 22 2016 10:44:12 GMT+0100 (CET) Image Tue Nov 22 2016 10:44:12 GMT+0100 (CET)                          Image Tue Nov 22 2016 10:44:12 GMT+0100 (CET) Image Tue Nov 22 2016 10:44:12 GMT+0100 (CET)

                                                                                     Design drawings




                        Image Wed Nov 02 2016 19:16:56 GMT+0100 (CET)


                                                                                 1:10 Model


                        Image Mon Nov 07 2016 12:14:44 GMT+0100 (CET)     Image Mon Nov 07 2016 12:14:44 GMT+0100 (CET)


                        Image Mon Nov 07 2016 12:14:44 GMT+0100 (CET)

                                 The base of the project: The piece which plugs in the tower to support the element


                        Image Mon Nov 07 2016 12:41:45 GMT+0100 (CET)Image Mon Nov 07 2016 12:41:45 GMT+0100 (CET)     

                                                              telescopic ladder that open from the door



    Week 1


                        Image Mon Nov 07 2016 11:59:58 GMT+0100 (CET) Image Mon Nov 07 2016 11:59:58 GMT+0100 (CET)

                                                       

                                         The double-element will take place on the tower by an hooking system.


                        Image Thu Nov 10 2016 21:57:01 GMT+0100 (CET)

                                                       Situation of the element on the 1:132 scenario model

  • / Zurich artefact and Lausanne layers

    Par pagano antonio, abbas oria, ballester simon, barbey samuel, bosshard cedric, boxebeld carlotta, carriere celine, farrell marie-ange, fleury yan, grigoryeva karina, nguyen tiffany, silva gabriel, sordet basile, tarditi davide, tran tuong vy, ulrich Sarah, vaucher eliott, 24/10/16

                                                                          Copper structure and plaster:


                         Image Mon Oct 24 2016 20:12:39 GMT+0200 (CEST)     

               



                                                                                      Plan projection:

                                                           Image Mon Oct 24 2016 23:56:02 GMT+0200


  • Levels

    Par silva gabriel, boxebeld carlotta, 02/10/16

    Our work corresponds to the assembly of :    - two different structures

                                                                     - two different levels

                                                                     - two different points of view.


    Level 1 : The angle of the systematic Bel Air building

    Level 0 : The random lines of the Fnac entrance



                                                           Image Sun Oct 23 2016 22:27:59 GMT+0200 (Europe de l’Ouest (heure d’été))
                                                                             Points of view 5 & 8

       


    Week 5


            Image Tue Oct 25 2016 09:06:21 GMT+0200 (CEST)

                                   Axonometry of the mold



    Week 4


             Image Tue Oct 25 2016 09:06:21 GMT+0200 (CEST)     Image Tue Oct 25 2016 09:06:21 GMT+0200 (CEST)

                                                                                Monges modified




             Image Tue Oct 25 2016 09:06:21 GMT+0200 (CEST)     Image Tue Oct 25 2016 09:06:21 GMT+0200 (CEST)

                                                                            Perspectives of the mold



                                                                                                                                                           

    Week 3

    Second plaster : lighter and more succinct to keep the essential lines with the defined volume of 1 liter.


           Image Sun Oct 16 2016 22:27:42 GMT+0200 (CEST)
           Image Sun Oct 16 2016 22:27:42 GMT+0200 (CEST) Image Sun Oct 16 2016 22:27:42 GMT+0200 (CEST)

                     It is impossible to see the level 1 from the point of view 5 and the level 0 from the point of view 8


                          Image Mon Oct 10 2016 14:05:31 GMT+0200 (CEST) Image Thu Oct 27 2016 21:06:01 GMT+0200 (Europe de l’Ouest (heure d’été))

                                                                                  second mold                                                   



    Week 2

    Measures devices :

            - the best module to measure exterior elements in which we roam was for us the step.
            - for the height of the Bel Air building, we measured its shadow on the ground which we compared with the size of our own shadow (the real length of which we knew).
            - for the height of the tower, we considered that it was twice worth the difference of the level 0 to the level 1.


    Image Tue Oct 04 2016 11:22:07 GMT+0200 (CEST)   Image Tue Oct 04 2016 11:22:07 GMT+0200 (CEST)

                    Monge of the angle of Bel Air building                                            Monge of the entrance of the fnac                                                  


                          Image Tue Oct 04 2016 11:12:27 GMT+0200 (CEST)Image Sun Oct 16 2016 20:40:08 GMT+0200 (CEST)

                                                                          First mold in common



    Week 1

    Observation of an element from a point of view.


    Zone 8

      Image Mon Oct 10 2016 14:28:22 GMT+0200 (CEST)  Image Sun Oct 16 2016 20:22:01 GMT+0200 (CEST)  Image Mon Oct 10 2016 14:52:14 GMT+0200 (CEST)  Image Sun Oct 16 2016 20:22:01 GMT+0200 (CEST)


     

    Zone 5

     Image Sun Oct 16 2016 20:22:01 GMT+0200 (CEST)  Image Sun Oct 16 2016 22:09:41 GMT+0200 (CEST)  Image Sun Oct 16 2016 20:22:01 GMT+0200 (CEST)