• Murmures 3D model

    Par Eric Gozzi, 07/06/19


    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)

    Perpective, view from lake




    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)


    Perspective, view from Grange au Lac

    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)

    Elevation, view from Screen project



    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)


    Perspective, view from top




    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)

    Prefabricated frames camion disposition



     The 3D model of Murmures has been entirely modelized by Eric Gozzi



  • Murmures 3D model

    Par Eric Gozzi, 07/06/19


    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)

    Perpective, view from lake




    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)


    Perspective, view from Grange au Lac

    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)

    Elevation, view from Screen project



    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)


    Perspective, view from top




    Image Fri Jun 07 2019 09:04:58 GMT+0200 (heure d’été d’Europe centrale)

    Prefabricated frames camion disposition



     The 3D model of Murmures has been entirely modelized by Eric Gozzi



  • Cheminement de Houses par les dessins

    Par Hugo Lavorel, 06/06/19


    Image Thu Jun 06 2019 12:45:59 GMT+0200 (heure d’été d’Europe centrale) Image Thu Jun 06 2019 12:45:59 GMT+0200 (heure d’été d’Europe centrale) 

    Premières esquisses et solution d'adaptation au nouveau site



    Image Thu Jun 06 2019 12:45:59 GMT+0200 (heure d’été d’Europe centrale) Image Thu Jun 06 2019 12:45:59 GMT+0200 (heure d’été d’Europe centrale)

    details constructifs: Mur 2 et Toit







  • The final drawing ?

    Par Hugo Cabaret, 06/06/19

    The weekend before loading the truck, I drew for the very last time of the year our wall. This is the non-permeable one, with all the slats and all the spaces between them. I also drew two details in axonometry in order to understand how we would pre-fabricate the slat panels. We simply built two horizontals holding all the slats so that we would just put those horizontals on the exitsting frames.

    Image Thu Jun 06 2019 12:01:07 GMT+0200 (CEST) ( Elevation Scale 1:20 ) 


    When we learned that our walls were going down by 1.65 meter, we were all pre-fabricating our walls and so we didn't have a correct drawing. This last drawing was then showing the size of the wall we would actually build. 


    But when we arrived in Evian, we learned that an error in the measures of the slope would again change the height of the walls, by another 40 centimeters. Our walls were 2 meters smaller than the beginning. 

    My drawing wasn't showing anymore the actual wall at the site. It became the part of the process and not the end of the process.





  • CONSTRUCTION PLANNING

    Par Gabrielle Chilinski, Victor Duchastel De Montrouge, 05/06/19


        Planning represents a crucial—yet conceptually often overlooked—aspect of any constructive project. In what order do you assemble and fix different elements? How long should each task last? How many people, and whom, should you dispose of and at what moment?  


    Planning Tuesday   Image Wed Jun 05 2019 09:38:31 GMT+0200 (Central European Summer Time)   Image Wed Jun 05 2019 09:38:31 GMT+0200 (Central European Summer Time)



    Image Wed Jun 05 2019 09:38:31 GMT+0200 (Central European Summer Time)   Image Wed Jun 05 2019 09:38:31 GMT+0200 (Central European Summer Time)



        Preliminary planning of the construction process. All elements are named after the following nomenclature (made in great part by Eric Gozzi):



       Image Wed Jun 05 2019 10:19:48 GMT+0200 (Central European Summer Time)   Image Wed Jun 05 2019 10:19:48 GMT+0200 (Central European Summer Time)  Image Wed Jun 05 2019 10:19:48 GMT+0200 (Central European Summer Time)





             Image Wed Jun 05 2019 10:32:13 GMT+0200 (Central European Summer Time)   Image Mon Jun 10 2019 10:52:21 GMT+0200 (Central European Summer Time)   Image Mon Jun 10 2019 10:52:21 GMT+0200 (Central European Summer Time)



        Composing groups to coordinate the different tasks was also key. Who excels at what tasks? Who works well together? In response, 5 groups of 3 were created (ranging from 'E1' to 'E5' in the planning above). Each group had a precise series of tasks to accomplish. 


        Ultimately, the planning was truly useful on site—particularly in the earlier stages. However, as different problems were encountered, many acts had to be altered and the order of assembly as well as the composition of groups also consequently modified. All in all we were positively surprised that we were able to advance much faster than what we had initially planned.


    Image Wed Jun 05 2019 09:38:31 GMT+0200 (Central European Summer Time)

                                                     Drawing (AutoCAD) of the construction process