• Workshop de Pâques

    Par Gabrielle Chilinski, Eric Gozzi, Victor Duchastel De Montrouge, 17/05/19





     La Protostructure des Studios Fauvel_Chiavi_Chassot

    Photos de l'avancement du montage (dernière partie)


    Image Fri May 17 2019 14:12:52 GMT+0200 (CEST)


    Image Fri May 17 2019 14:12:52 GMT+0200 (CEST)



    Image Wed Jun 05 2019 08:11:38 GMT+0200 (CEST)







    Nouvelle configuration et réimplantation des protostructures du studio Cheung_Baur _Marechal



    Image Wed Jun 05 2019 08:11:38 GMT+0200 (CEST)

    Technique du triangle d'or (3-4-5) 





    Image Wed Jun 05 2019 08:11:38 GMT+0200 (CEST)




    Image Wed Jun 05 2019 08:11:38 GMT+0200 (CEST)




    Cette nouvelle configuration offre une toute nouvelle relation entre les différents projets, elle engendre une lecture de passage depuis le funiculaire jusqu'à la Grange au Lac. De plus, cela souligne un dialogue avec le projet des trois autres studios et crée un espace qui joue avec l'extérieur et l'intérieur, tel une cour intérieur donnant sur deux "House".

    Une décision qui fut prise en peu de temps mais qui nous a permis de réagir vite et efficacement face à la situation. Le fait d'être directement confronté avec le terrain et immergé dans ses nouveaux paramètres nous a permis d'avoir un réel échange continu entre le dessin et le terrain.

    Ce fut d'autant plus stimulant car le site de la Grange au Lac est doté de beaucoup de qualité, d'un part avec sa pépinière qui offre un jeu d'ombre et de lumière et d'autre part avec la hauteur des arbres qui crée un sentiment d'immensité. Ce sentiment qui fait écho aux murs de notre projet "Murmures".








  • Grange au Lac ?

    Par Hugo Cabaret, 05/05/19

    When we came back after the workshop, during the fourth week, we had a long discussion in order to re-organize ourself facing the new site. As a matter of fact we learned before going on holidays that the construction on the site of the Belvedere had been refused. We were all disappointed, because in our project we liked the energy of the site and the nice horizon made by the proto : indeed there was three studios but we managed to give the experience of one common project.

    After seing the photos of the new site and after talking with the students that went there, we were convinced that if we worked enough, we would have a project as nice or even better as we had before.

    We fixed all the details, we flipped our walls again so that it would be nice to walk inside them, we worked on the bracings, we made a work schedule so that we are already prepared when building will start in Evian. We organized ourself in order to work efficiently

    After that, I first worked with Jerôme on the third wall, the one next to screen, and he did a new drawing with the right node, the right slope and the right proto. Given that we only needed one drawing on the third wall, I chose to do the drawing of the first wall, the one non-permeable.

    In parallel, I wanted to also work on the 1:1. I then helped the students that went to the workshops, and they helped me to build correctly.

    Next thing we have to deal with is finding the right way to build the bracings, is finishing the cut and the measures of all our frames, and is making a 3D drawing to see how to put the pre-fabricated elements in the truck. 



    Image Fri May 17 2019 16:46:07 GMT+0200 (CEST)


    (drawing of the first wall on the new slope with the new frames on the ground. The proto was also reduced by one cell) 

  • Construction

    Par Hugo Lavorel, Philippe Jenny, 30/04/19

    Construction échelle 1:1 d'un module de mur :


    Image Tue Apr 30 2019 09:59:51 GMT+0200 (CEST)



  • Prosposition for mounting on the second level

    Par Eric Gozzi, 29/04/19


    Image Mon Apr 29 2019 09:03:59 GMT+0200 (heure d’été d’Europe centrale)

    Little study for a vector that would let people to mount on the second level of our studio project. 




  • On a summer's day in 3D

    Par Eric Gozzi, 29/04/19


    Image Mon Apr 29 2019 08:52:35 GMT+0200 (heure d’été d’Europe centrale)

    perspective


    Image Mon Apr 29 2019 08:52:35 GMT+0200 (heure d’été d’Europe centrale)

    perspective escaliers



    Image Mon Apr 29 2019 08:52:35 GMT+0200 (heure d’été d’Europe centrale)


    perspective, mur 1 et 2 avec contreventement exaliers





    Image Mon Apr 29 2019 08:52:35 GMT+0200 (heure d’été d’Europe centrale)

    elevation

    ele