TECHNICAL DRAWINGS

Par Guillotin Lea, 27/04/20

With Nathan Pasche and Jean Richter from studio Wegman, Robin Gugger from studio Trieber, Marvin Tajana from studio Abenia.


WEEK 3

Intregration of  the project in the Galpon site, GENEVA

Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)



Drawings : plans / East & North elevations (scales 1:40)


Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)



Drawing : plans (scales 1:20)

This drawing highlights the position of the trees in the protostructure and show how they interact with the project


Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)


Drawing : Axonometry (scales 1:40)


We also developped the project by including a back stage underneath the bleacher and the walkway. This new room is surrounded by a tight lathing with a tiny horizontal opening allowing light supply. 



Image Wed Apr 29 2020 21:23:02 GMT+0200 (heure d’été d’Europe centrale)Image Wed Apr 29 2020 21:23:02 GMT+0200 (heure d’été d’Europe centrale)


Drawing : Section (scales 1:40)


You can access to the back stage thanks to those following stairs, directly from the debate room.

Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)  Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)   Image Mon Apr 27 2020 03:19:05 GMT+0200 (heure d’été d’Europe centrale)



Drawing : Perspectives 


We have also updated the second access to the project by redesigning de stairs on the roof, changing the tilt and the width.


Image Mon Apr 27 2020 04:57:35 GMT+0200 (heure d’été d’Europe centrale)

Collage : Perspective