HOUSES - WEEK 3

Par Gugger Robin, 27/04/20

With Nathan Pasche and Jean Richter from studio Wegman, Lea Guillotin from studio Bondu, Marvin Tajana from studio Abenia


WEEK 3

Intregration of  the project in the Galpon site, GENEVA


Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)
plans / East & North elevations (scales 1:40)

Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)
plans (scales 1:20)


This drawing highlights the position of the trees in the protostructure and show how they interact with the project.


Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)
Axonometry (scales 1:40)


We also developped the project by including a back stage underneath the bleacher and the walkway. This new room is surrounded by a tight lathing with a tiny horizontal opening allowing light supply. 


Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)

Section (scales 1:40)


You can access to the back stage thanks to those following stairs, directly from the debate room.


Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)    Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)   Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)

Perspectives



We have also updated the second access to the project by redesigning de stairs on the roof, changing the tilt and the width.


Image Mon Apr 27 2020 15:08:17 GMT+0200 (heure d’été d’Europe centrale)

Perspective