-
STAIRS RESEARCH
Par Zanota Armand, 08/05/20 -
HOUSES - WEEK 4
Par Gugger Robin, 07/05/20With Nathan Pasche and Jean Richter from studio Wegman, Lea Guillotin from studio Bondu, Marvin Tajana from studio Abenia
WEEK 4
implementation of the several improvements made to the structure
plans / East & North elevations (scales 1:40)
Axonometry (scales 1:40)
Axonometry (scales 1:40)
This week, improvements have been made to the structure. First of all, fondation work has been added. Then the stairs on the parking lot has changed and is now composed of many horizontal wooden rectangular platforms. A fountain along the slope of the stairs has also been developed and added. The shape of the balcony has evolved from a simple circle to a square. However, benches at its corners keep the circular shape of the walkway.
The bleachers of the debate room are now in a semi-circular shape, making the theater its only access. We also reduced the height of the backstage to solve the problem of intersection with the slope. A great job has been made by the garden group as well; they have developed different concepts as a mushroom place or a vegetal wall.
Plan for the sections (scales 1:40)
LONG SECTIONS (scales 1:40)
LARGE SECTIONS (scales 1:40)
In the followings day, we will work on the drawings; with the amelioration of the site (trees and ground) and we will also add the observatory which was added too late last week. The structure will be reviewed to support the loads.
-
Springworkshop: how to coordinate group work on the field?
Par Hayyane Filali Aymane, 05/05/20On the field, how to mount this?
Four elements are chosen in a projet from ROOMS
Choreography suggestion. Tools: "téléphone arabe" to organise the group work, mindmap to create a nomenclature, coordinates systèmes for the moves, simple moves symbols.
A person is reduced to two arms. Four persons take the M-AM-01, bring it to (7;0) after one turn right, an inclination to pass in the proto, turn left and finally assemble it following detail "Z1".