ROOMS

Par Suter Delphine Magaline, 26/02/20

WEEK 1 : BEGINNING

Image Wed Feb 26 2020 09:39:20 GMT+0100 (heure normale d’Europe centrale)


CREATING A SPACE WITH FOUR PLANS, USING THE HEIGHT OF THE PROTOSTRUCTURE TO CREATE A SENSATION OF INTERIORITY.

LOOKING FOR A WAY TO AVOID INTERSECTIONS WHICH ISOLATE THE PROTAGONIST FROM THE BEAUTIFUL ENVIRONMENT HE'S IN.

STUDY OF THE EFFECTS CREATED BY THE SHADOWS OF THE PLANS AT DIFFERENT TIMES OF THE DAY.



Image Sun Mar 01 2020 21:37:00 GMT+0100 (heure normale d’Europe centrale)Image Sun Mar 01 2020 21:37:00 GMT+0100 (heure normale d’Europe centrale)Image Sun Mar 01 2020 21:37:00 GMT+0100 (heure normale d’Europe centrale)Image Mon Mar 09 2020 14:05:29 GMT+0100 (heure normale d’Europe centrale)

PLAN 1/10                   ELEVATIONS 1/10          PERSPECTIVE FROM THE ENTRANCE          AXONOMETRY




WEEK 2 : CHANGES

FROM THE CONSTRAINT OF HAVING NO INTERSECTIONS CAME THE IDEA OF REFLEXION BETWEEN THE DIFFERENT PLANS

INSTEAD OF LIGHT AND SHADOW, THE USE OF SOUND WILL ESTABLISH AN INTERIORITY.

FOCALISATION OF THE ROAR OF THE RHONE AND THE SWISH OF THE FOREST AROUND THE SITE.


AS A RESULT

CONCEPTION OF AN INTERIOR PASSABLE WITHOUT LIGHT.

INTRODUCTION OF A MOVEMENT FROM TOP TO BOTTOM WITH THE SPACES CREATED BY FOCALISATION OF THE TWO SOURCES


ROOM VISIBLE BY HEARING.


Image Mon Mar 09 2020 14:05:29 GMT+0100 (heure normale d’Europe centrale)Image Mon Mar 09 2020 14:05:29 GMT+0100 (heure normale d’Europe centrale)

                      PLAN 1/10                                                 ELEVATION FROM WEST SIDE


(SOUND REPRESENTATION WITH HATCHES)




WEEK 3 : ESSENCE

ALMOST BUT NOT TOUCHING

THE IDEA OF SOUND GIVE THE OPORTUNITY TO IMAGINE A SOUND-REFLECTING ROOM.

REPETITION OF AN ISOSCELES TRIANGLE CREATE BY THE NESTING OF THE THREE DIAGONALS PLANS.

CONVERGENCE OF THE PLANS IN THE CENTER OF THE ROOM, 

CONRTADICTION BETWEEN THE DENSIFICATIONS AND THE VOID CREATE BY THE HOLE IN THE CENTER OF THE HORIZONTAL PLAN.

ENHANCEMENT OF THE PROTSTRUCTURE PASSING THROUGH THE SPACE WITHOUT TOUCHING IT.


Image Mon Mar 09 2020 14:31:02 GMT+0100 (heure normale d’Europe centrale)

FIRST SKETCH





WEEK 4 : INSERTION 

CUT OF THE HORIZONTAL PLAN.


 PRODUCTION OF A CROSS FROM THE STRUCTURE AROUND THE TRIANGLE TO DEVIATE THE PROTOSTRUCTURE.


Image Sun Mar 15 2020 10:21:14 GMT+0100 (heure normale d’Europe centrale)

HORIZONTAL PLAN, NESTING


Image Sun Mar 15 2020 10:21:14 GMT+0100 (heure normale d’Europe centrale)Image Sun Mar 15 2020 10:21:14 GMT+0100 (heure normale d’Europe centrale)ASSEMBLING IN THE PROTOSTRUCTURE




CONSTRUCTION OF THE DIAGONAL PLANS SUSPEND TO THE PROTOSTRUCTURE WITH A SYSTEM OF THREE ATTACHMENT NOD FOR EACH PLAN

Image Sun Mar 15 2020 13:14:39 GMT+0100 (heure normale d’Europe centrale)


Image Sun Mar 15 2020 13:14:39 GMT+0100 (heure normale d’Europe centrale)

CONSTRUCTION'S DETAILS OF THE DIAGONALS PLANS





WEEK 5 AND 6 : METAMORPHOSIS

VIRTUAL CONSTRUCTION OF A DEBATE ROOM



Image Mon Mar 30 2020 09:09:33 GMT+0200 (heure d’été d’Europe centrale)


                PLAN AND ELEVATION                                             ROOF AND GROUND CONDITION





Image Tue Mar 31 2020 13:45:27 GMT+0200 (heure d’été d’Europe centrale)


             VIEW FROM THE ENTRANCE                                                 INTO THE EYES OF THE MODERATOR




Image Mon Mar 30 2020 09:09:33 GMT+0200 (heure d’été d’Europe centrale)

              PODIUMS CONDITION                                              AXONOMETRY AND MOCKUP OF THE

ATTACHMENT NOD IN 1/10                    

  



Image Mon Mar 30 2020 09:09:33 GMT+0200 (heure d’été d’Europe centrale)

CUT OF THE PROTOSTRUCTURE AND CONSOLIDATION OF IT